2024 Utility Reconstruction
Reconstruction MapThe 2024 Utility Reconstruction project is a joint project with the City of New Hope. It includes the replacement of sanitary sewer (including a portion of the connected services to the properties), water main (including the water services to the curb stops at each property), storm sewer as needed, and a new sidewalk along the east side of the roadway. Once all utility work is complete, the curb and gutter will be replaced and the streets paved.

In all, the 2024 Utility Project includes the following streets:
• Louisiana Ave. N. from Medicine Lake Rd. to 32nd Ave. N.
• 31st Ave. N. from Louisiana Ave. N. to the cul-de-sac (City of New Hope)

Project Timeline:
• Design: Winter 2023 - 2024
• Bidding and award contract: Spring 2024
• Construction: Spring 2024 - Fall 2024

Project Information
Project Information Packet

Project E-newsletter Signup
Subscribe to 2024 Utility Reconstruction Project e-newsletter updates here. Despite subscribing to e-newsletters, hard copies are still delivered to each property in the project area.
   • Project Notification Start Letter
   • Project Update Letter (Sept. 18)
   • Sod Care Letter (Sept. 27)

Reconstruction Project Video Series:
   • Long-term Plan, Utility Reconstruction and Project Funding
   • Neighborhood Surveys
   • Removals, Driveway Aprons and Material Storage
   • Mail, Driveway Access, Temporary Water and Trash Collection
   • Sanitary Service Repair and EDA Grant
   • Water Service Work
   • Concrete Work
   • Sod, Tree and Road Replacement
   • Private Driveways
   • Non-conforming Driveways

Project Funding
It is the city council’s intent to not special assess property owners, nor borrow money, to pay for these utility reconstruction projects. Instead, the utility reconstruction program is paid for primarily from water, sanitary sewer and storm sewer utility funds, which are maintained through the utility bills paid by residents and businesses. The other major source of funding is from the street maintenance fund, which is maintained primarily by property taxes, as well as state aid funding.

As part of the city’s project, private property owners can have their sanitary sewer service pipe repaired through an OPTIONAL program paid entirely by the property owner.


1

2024 Street Maintenance
From May through September, Crystal will conduct mill and overlay street projects on the following streets: 

Mill Project Map

• Colorado Ave. N. from 36th Ave. N. to 39th Ave. N.
• Brunswick Ave. N. from 36th Ave. N. to 39th Ave. N.
• Adair Ave. N. from 38th Ave. N. to 41st Ave. N.
• Zane Ave. N. from 36th Ave. N. to the Robbinsdale border south of 39th Ave. N.
• Yates Ave. N. from 36th Ave. N. to the Robbinsdale border south of 39th Ave. N.
• Xenia Ave. N. from 36th Ave. N. to the Robbinsdale border south of 39th Ave. N.
• Welcome Ave. N. from 36th Ave. N. to the Robbinsdale border south of 39th Ave. N.
• Vera Cruz Ave. N. from 38th Ave. N. to the Robbinsdale border south of 39th Ave. N.
• 38th Ave. N. from Yates Ave. N. and Welcome Ave. N.
• 39th Ave. N. from Colorado Ave. N. to Adair Ave. N.